Executed a high-stakes telecommunications project for Maxis and UMobile on a remote island, managing equipment installation, site decommissioning, and network testing under severe environmental constraints. With boat transport as the sole connection to the island and zero vehicle access on-site, the team navigated daily jungle hikes while manually hauling heavy gear in relentless rainy season conditions. Operating within strict daily timeframes due to extreme weather risks and daylight limits, the deployment was successfully delivered while maintaining rigorous safety standards to avoid being stranded in the wilderness.
Telco Equipment Arrival at Jeti Batu Musang
✦ Need to manually carry all equipments manually via manpower up to site at hilltop (total weight of ±2 tonnes by 10 ppl)
Manual Material Transport & Uphill Trekking to Pulau Aman Site
✦ No machinery/transport to pull up equipments to top of tower- manual hoisting
✦ Clear the trees and branches blocking the path to the site
Equipment Installation
✦ Installation in progress
✦New equipment installation and swap
Decommissioned Materials
✦ Manually carry decommissioned materials down from hill top to the beach and back to mainland via boat
User Acceptance Testing (UAT) & Provisional Handover (PHU)
✦ Network testing done via boat